ISTRES – BA 125 (13-France)
Fire project management
Fire project management for the renovation of 3 aircraft hangars HM3, HM203 and F7X with the TPFI design office
Project manager
Project management for the rehabilitation of a hangar.
Assistance
Assistance with the aim of carrying out work on the fire water source
Feasibility study
Feasibility study for upgrading fire protection in several hangars
MÉRIGNAC (33-France)
Master plan
Master plan for the installation of fire protection
Preliminary design
Preliminary design study and fire protection DCE as part of the renovation project of a painting workshop
Project manager
Project management for the creation of a new emulsifier storage/dosing building