- Date
- 30 August 2024
CONGO Specific for TOTAL Design assistance for the video surveillance and access control system of the separate Poincaré sites. Drafting of detailed technical specifications for the […]- Date
- 30 August 2024
Redon (35-France) Fire protection assistance Assistance with bringing the fire protection equipment on the site into compliance. Project manager Bringing fire detection installations into compliance. Baupte […]- Date
- 30 August 2024
PRIVAS (07-France) FEUCHY (62-France) PIERRE BENITE (69-France) SERQUIGNY (27-France) RIBECOURT (60-France) COUBERT (77-France) GENAY (69-France) Industrial risk management Impact study of new regulations (after Rouen’s fire) […]- Date
- 30 August 2024
CLERMONT DE L’OISE (60-France) Preliminary design studies assignment Upgrading of fire protection systems using sprinklers (thirty-year review) for the D210 store and the building plan (new […]- Date
- 30 August 2024
VOREPPE (38-France) Detailed design study Preliminary design studies for sprinkler fire protection for the workshops- Date
- 30 August 2024
LE MEUX (60-France) ‘After Rouen’s fire” study French regulation Carrying out an impact study of new regulations (after Rouen’s fire) on the BOSTIK site- Date
- 30 August 2024
ROUFFIGNAC (24-France) Industrial risk management Impact study of new regulations (after Rouen’s fire) on the CHRISTEYNS site VERTOU (44-France) Feasibility study Feasibility study for fire protection […]- Date
- 30 August 2024
CHAUNY (02-France) Industrial risk management Impact study of new regulations (after Rouen’s fire). Assistance with a project to install a methanol tank. CERNAY (68-France) Project manager […]- Date
- 30 August 2024
LANESTER (56-France) Preliminary design study Preliminary design study for the renovation of fire and gas detection systems