- Date
- 30 August 2024
Judicial Center of the National Gendarmerie Expert appraisal assignment Technical appraisal for an automatic gas extinguishing system following a fire at the judicial centre of Gendarmerie […]- Date
- 30 August 2024
Judicial Division of the National Gendarmerie Expert appraisal assignment Technical appraisal for an automatic gas extinguishing system following a fire at the judicial centre of Gendarmerie […]- Date
- 30 August 2024
Tours (37-France) Fire feasibility study assignment Feasibility study for fire protection of a printing works- Date
- 30 August 2024
Istres – BA 125 Fire project management assignment Fire project management for the renovation of 3 aircraft hangars HM3, HM203 and F7X with the TPFI design […]- Date
- 30 August 2024
VIC-LE-COMTE (63-France) Preliminary design study assignment Fire project management for the construction of a site for Banque de France, subcontracted by WSP. CORBEIL-ESSONNES (91-France) Project management […]- Date
- 30 August 2024
CALAIS (62-France) Project management assistance Project management assistance with the fire protection of several units of the MERCK site- Date
- 30 August 2024
DONGES (44-France) Project management assistance Project management assistance with the installation of an automatic gas extinguishing system for SNCF as part of the Saint-Nazaire Industrial Zone […]- Date
- 30 August 2024
ST VIGOR d’YMONVILLE Project management assistance Project management assistance with the site fire protection GRAND-COURONNE (76) Project management assistance Drafting of a fire definition note- Date
- 30 August 2024
NICE (06-France) Project management assistance Reworking of the sprinkler/fire hose station design file in the basic design study phase for MIN. Project management assistance Approval of […]