ITANCOURT (02-France) Thirty-year study assignment Phase 1 : Feasibility study Phase 2 : Detailed investigation Phase 3 : Drafting of specifications for the work, and a […]- Date
- 30 August 2024
MOROCCO Audit of installations – Compliance audit -Diagnostic audit APSAD & NFPA Upgrading of fire defence systems at 4 NABC plants in Morocco- Date
- 30 August 2024
Villers-Ecalles (76-France) Feasibility study APSAD Feasibility study for fire protection using sprinklers- Date
- 30 August 2024
Redon (35-France) Fire protection assistance Assistance with bringing the fire protection equipment on the site into compliance. Project manager Bringing fire detection installations into compliance. Baupte […]- Date
- 30 August 2024
PERPIGNAN (66-France) Analysis of sprinkler pipe corrosion Analysis of corrosion to sprinkler pipes in a galvanised steel network- Date
- 30 August 2024
Mably (42-France) Fire project management assignment Carrying out a preliminary design study, drafting a tender file and assisting with the selection of works contract as part […]- Date
- 30 August 2024
LISSES (91-France) Project management assistance Analysis of whether the current fire protection is adequate for the new risks and definition of the changes to be made […]- Date
- 30 August 2024
SALLE D’ANGLES (16-France) Project management assignment FM GLOBAL Project management for upgrading the sprinkler systems- Date
- 30 August 2024
JOSSELIN (35-France) Project management APSAD Modification of the automatic sprinkler system on the site.