SAINT-OUEN (93-France) Audit APSAD / NFPA / FM GLOBAL Fire protection audit Fire water source feasibility NFPA Feasibility study for the installation of a new fire […]- Date
- 30 August 2024
ITANCOURT (02-France) Thirty-year study assignment Phase 1 : Feasibility study Phase 2 : Detailed investigation Phase 3 : Drafting of specifications for the work, and a […]- Date
- 30 August 2024
EGYPT Technical assistance NFPA Surveys and production of AutoCAD drawings of sprinkler systems at 2 SERVIER sites in EGYPT Gidy (45-France) Fire protection study Fire studies […]- Date
- 30 August 2024
Arabia Audit service NFPA Audit and list of work to be carried out ESID – BA 115 (84-France) Competition Fire studies for the competition to build […]- Date
- 30 August 2024
Avignon dam (84-France) Fire vulnerability study assignment Fire vulnerability study for the Avignon hydroelectric dam Automatic gas extinguishing system study at the Avignon hydroelectric dam 7 […]- Date
- 30 August 2024
SAILLAT-SUR-VIENNE (87-France) Preliminary design Fire protection and detection preliminary design study for a CRE5 biomass power plant SULLY/LOIRE (45-France) Fire protection project management Project management for […]- Date
- 30 August 2024
Redon (35-France) Fire protection assistance Assistance with bringing the fire protection equipment on the site into compliance. Project manager Bringing fire detection installations into compliance. Baupte […]- Date
- 30 August 2024
MANOSQUE (04-France) Feasibility study Feasibility study for upgrading a smoke extraction system and site compartmentalization. Modeling of dangerous phenomena Optimization of modeling of dangerous phenomena likely […]- Date
- 30 August 2024
Calais (62-France) et Lyon (69-France) Fire protection project management Project management for the installation of a fire protection system on Calais and Lyon sites. Calais (62-France) […]