- Date
- 30 August 2024
LE PLESSIS PATE (92-France) Feasibility study Feasibility study for bringing sprinkler equipment into compliance and obtaining N1 certification, as well as consultancy during the exchanges that […]- Date
- 30 August 2024
LA BAR-SUR-LOUP (06-France) Industrial risk management Impact study of new regulations (after Rouen’s fire) and insurer recommendations NOTRE-DAME (06-France) Feasibility study assignment Bringing the equipment into […]- Date
- 30 August 2024
FORBACH (57-France) Instrumented Risk Management Measures study assignment Instrumented Risk Management Measures (MMRI) study on the Forbach site.- Date
- 30 August 2024
GIEN (45-France) Audit Fire audit of the site Drafting of the fire defence plan and the preliminary design for the fire defence equipment Drafting of the […]- Date
- 30 August 2024
Vitry-sur-Seine (94-France) Fire Safety System audit Fire audit of the site Ploërmel (56-France) Technical assistance Fire technical Assistance assignment- Date
- 30 August 2024
EPERNON (28-France) Project manager Fire project management for the installation of a new fire pumping station EPERNON (28-France) Maîtrise d’œuvre Fire project management for the installation […]- Date
- 30 August 2024
Orphin (78-France) Definition study Definition study of the fire protection system for the storage of flammable liquids at the GUERLAIN site in Orphin.- Date
- 30 August 2024
Dunkerque (59-France) Project management assignment Fire project management for the fire protection of one of the site units.- Date
- 30 August 2024
VILLENEUVE LA GARENNE (92-France) Thirty years Thirty-year diagnostics to update the equipment in accordance with regulations, insurance recommendations and best practice. COUTERNE (61-France) Contracting owner assistance […]