- Date
- 30 August 2024
MANTES-LA-VILLE (78-France) Feasibility study assignment Fire feasibility study as part of the installation of a sprinkler-type fire protection system- Date
- 30 August 2024
PAMIERS (09-France) Project manager assignment On-site tests and preliminary design study for the fire protection of an oil tank.- Date
- 30 August 2024
BUJAGALI (UGANDA) Drafting of assembly, operation and maintenance manuals. Working drawings for water source and transformer protection. Monitoring of the project on behalf of SIEMENS: Validation […]- Date
- 30 August 2024
SAILLAT-SUR-VIENNE (87-France) Preliminary design Fire protection and detection preliminary design study for a CRE5 biomass power plant SULLY/LOIRE (45-France) Fire protection project management Project management for […]- Date
- 30 August 2024
NANTES (44-France) Writing a chapeau notice Production of a summary notice and site monitoring for the development of Nantes station CHATILLON (92-France) Audit and feasibility assignment […]