ISSY-LES-MOULINEAUX (91-France) Fire Safety System technical assistance Technical assistance with the Fire Safety System for the ISSY-LES-MOULINEAUX sorting centre LABESSIERE-CANDEIL (81-France) Project management assignment Project management […]- Date
- 30 August 2024
GRENOBLE ALPES METROPOLE Preliminary design Preliminary design study on fire protection for the future methanisation unit LE FONTANIL CORNILLON (38) Feasibility study Feasibility study to examine […]- Date
- 30 August 2024
BAYONNE (64-France) Fire diagnostics “Fire diagnostics” of all sorting, recovery and storage units Industrial risk management Product analysis, ATEX risk assessment, ATEX zoning plan and assistance […]- Date
- 30 August 2024
Ivry (94-France) Project management assignment Project management for improving fire protection at the Paris IPXIII incineration plant- Date
- 30 August 2024
METZ (57-France) Audit and feasibility study Fire audit and feasibility study for the HAGANIS energy recovery unit.- Date
- 30 August 2024
LOOS (59-France) Fire risk analysis assignment Support to EBHYS with fire risk analysis and drafting of a description of the recommended equipment MASSEUBE (33-France) Fire Safety […]- Date
- 30 August 2024
STRASBOURG (67-France) Feasibility study Feasibility study for improving fire protection at the unit for household waste energy recovery- Date
- 30 August 2024
LE GRAND-QUEVILLY (76-France) Technical assistance Project management assignment Technical assistance with improving fire safety Project management for improvement of fire protection and detection on an insurance […]- Date
- 30 August 2024
MAISONS-LAFFITTE (78-France) Technical assistance Update of the study on the definition and installation of fire hydrants